
Feedback on a construction site delivered in 2024 for the parking lot of the supermarket ALDI France — Les Fins (25), in Doubs.
Project constraints
ATALUS solutions implemented:
In total, 3,950 ATALUS modules were installed with a bed reinforced by geotextile sheets supplied by HUESKER Group.
→ 76° retaining wall, height 6.90 m, allowing the circulation of heavy vehicles.
→ Creation of additional parking spaces.
Result:
A stable, accessible and sustainable car park, now integrating plant plantations that contribute to a welcoming and functional space for users.
Project carried out with:
Agence 2BR, SAGA Ingénierie and Eiffage Route.
Delivery: August 2024
This project illustrates the versatility of ATALUS solutions, capable of meeting strong technical constraints while promoting outdoor facilities.